Ascona Group invests £1.75 million into KDRB at Machynlleth

September 28, 2021
David Lamb

Ascona Group are proud to announce a £1.75 million investment into a knock down and rebuild of their site at Machynlleth.

The new site, expected to start work in March 2022 and take 6 months to complete, will have an increased number of fuel pumps boasting 8 with dedicated HGV lanes. There will also be pumps for gas oil and kerosene at the kerbside. The retail area will be expanded to 3,500 Sq ft with an addition 8 full time and 4 part time jobs created for the local area. Additional parking and space for up to 12 EV points, along with a rollover car wash are also incorporated into the plans.

C+A Design were appointed to create the site sympathetic to existing buildings in the area whilst incorporating green and enviromentally friendly systems within the infrastucture. They were also appointed for our premier site at Ascona Green Garage in Pembrokeshire.

The new Nisa branded store will keep an expanded range of products, and a Food to go offering incorporated into the main building.

Opening of the new site is expected to be on 1st August 2022.

Further details and progress can be seen on our Facebook page.

David Lamb

35 years experience in retail management, marketing, I.T and design

About us

In an ever-changing retail world, Ascona Group aims to bring right-on-time convenience, service and quality to motorists and communities. Forecourts have a new champion.